Projects for 2008
1. Coventry Rd-Cambridge Rd to Lingle Ave
Overlay with 9.5mm, 2.0 inches thick -
Estimated Cost $5,914
2. Cambridge Rd-Lingle Ave to Lingle Ave
Overlay with 9.5mm, 2.0 inches thick -
Estimated Cost $106,422
3. Barrington Rd-Yorkshire Rd to Cambridge Rd
Overlay with 9.5mm, 2.0 inches thick -
Estimated Cost $22,467
4. Yorkshire Rd-Barrington Rd to Lingle Ave
Overlay with 9.5mm, 2.0 inches thick -
Estimated Cost $10,640
5. Orchard Dr-Campbelltown Rd to Park Dr
Overlay with 9.5mm, 1.50 inches thick -
Estimated Cost $10,454
6. East Ridge Rd-N Forge Rd To Naftzinger Rd 
From N Forge Rd East 1900'  (1/3 of the Length)
Overlay with 9.5mm, 2.5 inches thick -
Estimated Cost $41,800
Total 2008 Road Projects $197,697